MDR
MDR Certification EngineersROV Inspection & Cleaning Division
Remora · ROV Tank Floor Cleaning
Interactive 3D concept · cleans the floor in service · no drain-down · no confined-space entry
MDR-ROV-01Rev 06 · Polish + film
TANK IN SERVICE · 0 L DRAINED
Cameras
Components
Water tank · corrugated ring tank, ~447 kL, in service
Water volume · tank stays full for the whole job
Sediment field · ripple dunes, crust banks, inlet cone
Remora crawler · MDR-ROV-01, suction skid + camera mast
In-tank pump · submersible PD pump in strainer canister
Inspection ROV · 4K visual survey and verification
Hose + tether run · suction out, polished water back
Hino 500 + 20 ft container · control front, filtration rear
REV 06 · CLIENT STORY + DEEP DIVE
Scene scale 1:1 · tank Ø 8.8 m × 7.4 m (≈ 447 kL)
Press Play story for the client walkthrough, Animate cycle for the full job, or open the deep-dive modes below.
1 · Set up & permits
2 · ROV launch
3 · Baseline survey
4 · Plan & deploy Remora
5 · Floor clean
6 · Detail pass
7 · Verify
8 · Retrieve & report
Drag = orbit · Wheel = zoom · Right-drag = pan · Keys 1-7 = cameras · Space = cycle · C = cutaway · R = reset
MDR-ROV-RD-001 · Remora Interactive 3D · Rev 06 (polish + film)
© MDR Certification Engineers Pty Ltd · Commercial-in-Confidence
© MDR Certification Engineers Pty Ltd · Commercial-in-Confidence
MDR
REMORA
ROV TANK FLOOR CLEANING · IN SERVICE
MDR CERTIFICATION ENGINEERSFloor cleaned · 0 L drained
Tank never left service
REMORA · MDR-ROV-01
MDR Certification Engineers Pty Ltd · Commercial-in-ConfidenceCRA -30 28C 192 6.4M
REC ●
2026-08-31 00:00:00